Spring Run Stadium

The Pennsylvania State University - Altoona Campus
Blair County, PA

Penn State Altoona’s existing synthetic turf field at Spring Run Stadium had reached the end of its useful life and required replacement to maintain safe, reliable athletic facilities for student athletes and campus users. The project was advanced as part of the University’s ongoing campus master planning efforts. Penn State sought a cost-effective solution that would replace the existing e-layer, stone base, and drainage infrastructure.

K&W developed a project base plan with availability survey information, historical development plans, and aerial mapping. Following a site visit and evaluation of current conditions, we worked collaboratively with University representatives to review and develop options for permanent field striping and layout configurations. A final preferred alternative was advanced into design and construction documents for procurement through the State Contract process.

K&W prepared rendered schematic plans, technical specifications, and construction documents to support bidding and installation. In addition, K&W assisted the University through contractor bid reviews, submittal and shop drawing reviews, response to RFIs, and field observations. This comprehensive approach helped streamline project delivery while providing a renewed synthetic turf facility that will continue serving Penn State Altoona’s athletic and recreation programs for years to come.

Features

  • Synthetic turf replacement
  • Athletic field striping design
  • Existing conditions assessment
  • Base mapping development
  • Site layout planning
  • Rendered schematic plans
  • Technical specifications
  • Bid phase assistance
  • Construction administration