tOTAL SITE iNVESTIGATION, EVALUATION, & PLANNING IN SPRING GARDEN TOWNSHIP
K&W led the site evaluation, investigation, and site planning work for a global food manufacturer’s operational expansion evaluation. Working with a design-build contractor, we performed a comprehensive due diligence study on an existing structure / campus in an industrial area. Geotechnical services were also requested for the evaluation.
A key component of the project was development of a site master plan (layout and grading) for a +/- 116,000 SF building addition and parking / traffic circulation on the 22-acre campus.
This included extensive review of municipal zoning and subdivision / land development ordinance requirements, preparation / submission of a Traffic Scoping report and Traffic Impact Study, coordination with the Township Engineer, and coordination with municipal staff regarding sewer availability / capacity for the project.
Features
- Boundary & Topographic Survey
- ALTA/NSPS Land Title survey
- Phase I & II Environmental Site Assessment
- Preliminary Geotechnical Engineering Report
- Transportation Impact Study
- Subsurface Utility Investigation
- Wetlands Investigation
- Master Site Layout and GradingPlanning
- Township Ordinance Review and Engineer/Staff Coordination